Part 5
Installing and assembling the sections
Instalando y ensamblando las secciones
Previous Part 4 - Building the gin-pole
Installation Day 1 - Friday - Second section installed
Installation Day 1 - Friday - Second section installed
Instalacion Dia 1 - Viernes - Segunda sección instalada
Installation Day 2 - Saturday - Sections 3 and 4
Installation Day 2 - Saturday - Sections 3 and 4
Instalación Dia 2 - Sabado - Secciones 3 y 4
Setting up the gin-pole for the next section
Setting up the gin-pole for the next section
Preparando el guinche para la próxima sección
Getting ready to pull the rope
Getting ready to pull the rope
Preparado para tirar la soga
Fitting the legs and matching holes
Fitting the legs and matching holes
Encajando las patas y haciendo coincidir los agujeros
It worked! Now one more section to go up
It worked! Now one more section to go up
Funciono! Ahora a subir una sección mas
Section 3 is in place
Section 3 is in place
Seccion 3 en su lugar
Section 4 is in place too, I'm done for today
Section 4 is in place too, I'm done for today
La seccion 4 esta en su lugar, ya termine por hoy
Installation Day 3 - Sunday - Sections 5 and 6
Installation Day 3 - Sunday - Sections 5 and 6
Instalación Dia 3 - Domingo - Secciones 5 y 6
Setting up to raise the last two sections
Setting up to raise the last two sections
Preparando para subir las dos últimas secciones
Section 5 is up, one more to go
Section 5 is up, one more to go
La seccion 5 ya esta arriba, una mas y listo
And section 6 is up, all done!
And section 6 is up, all done!
Y la sección 6 está arriba, todo terminado!
View from the back of the house
View from the back of the house
Vista desde la parte de atrás de la casa